1 In the event that geological investigations and the construction of a deep geological repository should result in significant volumes of excavated, extracted or demolition material that cannot be used or stored in the immediate vicinity of the site, the authorities of the canton concerned shall designate sites necessary for the disposal of that material.
2 In the event that the canton concerned has not granted a licence, or that the licence issued has not entered into force at the time the construction licence for carrying out geological investigations is granted, the Department may designate an interim storage site and attach conditions and requirements governing its use. The provisions governing procedures as specified in this section apply. The canton concerned shall designate sites for the disposal of the material within a period of five years.
1 Se, all’atto delle indagini geologiche e della costruzione di depositi in strati geologici profondi, sono prodotte notevoli quantità di materiale erompente, estrattivo o di demolizione che non possono essere utilizzate o depositate nelle vicinanze, i Cantoni interessati designano i siti necessari per lo smaltimento del materiale.
2 Se, al momento del rilascio della licenza di costruzione o della licenza per indagini geologiche, non vi è alcuna autorizzazione del Cantone passata in giudicato, il Dipartimento può designare il sito per un deposito intermedio e vincolarne l’utilizzazione a condizioni e oneri. Si applicano le disposizioni di procedura della presente sezione. Il Cantone designa entro cinque anni i siti per lo smaltimento del materiale.
This document is not an official publication. Only the publication of the Federal Chancellery is legally binding.
Il presente documento non è una pubblicazione ufficiale. Fa unicamente fede la pubblicazione della Cancelleria federale. Ordinanza sulle pubblicazioni ufficiali, OPubl.